GAF Manufacturing Facility

New 201,615 SF tiltwall building for the manufacture of poly-ISO insulation board, constructed next to GAF's existing manufacturing building in Gainesville, Texas.

GAF Manufacturing Facility

  • Exterior photo of GAF Manufacturing Facility from general contractor Bob Moore Construction company
  • Exterior photo of GAF Manufacturing Facility from general contractor Bob Moore Construction company
  • Exterior photo of the entrance GAF Manufacturing Facility from general contractor Bob Moore Construction company

Project Summary

New manufacturing facility with 50,000+ SF of production space that houses a custom-designed assembly line for creating and packaging the insulation boards, 150,000 SF for warehousing of packaged insulation boards and a tank farm with six tanks and associated containment systems inside the building.

  • Categories:

    • Manufacturing Facility
    • Tilt-Up Construction
    • Design / Build Contractor
  • Owner / Developer: GAF
    Architect: Callahan & Freeman Architects

Project Detail

Bob Moore Construction was the design / build contractor for a new tiltwall building for the manufacture of poly-ISO insulation board, constructed next to GAF's existing manufacturing building in Gainesville, Texas.

The new manufacturing facility is an independent building with its own offices, loading bays, restrooms and employee break areas, tied into the existing building with canopies. It includes 50,000+ SF of production space that houses a custom-designed assembly line for creating and packaging the insulation boards. The remaining 150,000 SF is dedicated to the warehousing of packaged insulation boards for distribution through one of four loading docks, restrooms and employee break areas.

The foundation features multiple custom-designed equipment foundation pads to support the massive production equipment.

As part of the construction project, Bob Moore Construction built a tank farm with six tanks and associated containment systems inside the building. Each tank is large enough to hold the contents of one rail tanker car; because the tanks were so large, Bob Moore Construction was forced to leave a space open in the roof to bring them into the tank farm area. Once the tanks were properly positioned and installed the roof could then be completed.

The project also included significant expansion and enhancement of the rail yard area adjacent to the new building, including the construction of a new containment system for a large outdoor chemical silo.

This project required extensive groundwork and MEP work to the site. Cconstruction took place in close proximity to active manufacturing processes, requiring significant communication with GAF's truck drivers, employees and management to ensure existing production work was not disrupted.

 

Printable Version - Construction Project Profile (PDF Format):

GAF Manufacturing Facility - Gainesville, Texas

 


 

More Projects:

View more distribution center construction projects by general contractor Bob Moore Construction.

 