First Garland Business Center Phase II

Phase II of this ambitious project delivered a new 435,180 SF speculative office and warehouse building to Garland, Texas.

First Garland Business Center Phase II

  • Exterior photo of First Garland Business Center Phase II from Design / Build Contractor Bob Moore Construction company
  • Exterior photo of First Garland Business Center Phase II from Design / Build Contractor Bob Moore Construction company
  • Exterior photo of the entrance First Garland Business Center Phase II from Design / Build Contractor Bob Moore Construction company

Project Summary

435,180 SF of speculative office and warehouse building space in Garland, Texas to add to the 944,000 SF Phase I of this project, built by design / build contractor Bob Moore Construction.

  • Categories:

    • Distribution Center
    • Warehouse
    • Office Building
    • Tilt-Up Construction
    • Design / Build Contractor
  • Owner / Developer: First Industrial Trust
    Architect: Hardy McCullah/MLM Architects, Inc.

Project Detail

Approximate Size: 435,180 SF

Bob Moore Construction was the design / build contractor for First Garland Business Center Phase II, delivering 435,180 SF of speculative office / distribution center / warehouse building space to Garland, Texas.

This project was Phase II of the First Garland Business Center project. Phase I included the construction of First Garland Business Centers I and II along with the site mass grading and utility installation for Phase II.

The Phase II building provides 435,180 SF of speculative warehouse space. Constructed with 242 tiltwall panels, it features 52 overhead doors and smoke exhaust system with fans and louvers. The building paint scheme matches that of Phase I. As part of Phase II we built a retaining wall as high as 12’ along the west and north property line.

The utilities installed and the building pad in Phase I were designed to serve a building of a different size/configuration. The utilities and the pad had to be revised to serve the new building. During the original utilities installation and the building, the City changed several of their engineering utility requirements. This necessitated many modifications, including relocating some of the building fire service and remote fire department connection, water vaults, fire hydrants, and even manhole lids.

 

Printable Version - Construction Project Profile (PDF Format):

First Garland Business Centers Phase II - Garland, Texas

 


 

More Projects:

View more distribution center construction projects by Design / Build Contractor Bob Moore Construction.

 

Are you interested in project management expertise with a focus on controlling your construction costs and meeting your schedule for a commercial building project? Please contact Kyle Whitesell or Larry Knox at (817) 640-1200. Or if you prefer, contact us online with our contact form.

More Project Photos