Power Service Manufacturing / Warehouse

Manufacturing and warehouse facility built for Power Service in Weatherford, Texas.

Power Service Manufacturing / Warehouse

  • Photo of Power Service Manufacturing / Warehouse from General Contractor Bob Moore Construction company
  • Photo of Power Service Manufacturing / Warehouse from General Contractor Bob Moore Construction company
  • Photo of Power Service Manufacturing / Warehouse from General Contractor Bob Moore Construction company
  • Photo of Power Service Manufacturing / Warehouse from General Contractor Bob Moore Construction company

Project Summary

103,000 SF manufacturing facility and bottle storage warehouse built for industry leader in diesel fuel additive technology in Weatherford, Texas by Bob Moore Construction.

  • Categories:

    • Manufacturing
    • Distribution Center
    • Warehouse
    • Tilt-Up Construction
    • General Contractor
  • Owner / Developer: Power Service
    Architect: OWT Architects

Project Detail

Bob Moore Construction was the general contractor for the 103,000 SF manufacturing facility and warehouse located in Weatherford, Texas. The building was constructed for for Power Service, a leading manufacturer of diesel fuel additives.

The shell of the facility is constructed with insulated tiltwall panels to support the controlled temperatures necessary for the chemicals used to produce the additives. A Varco-Pruden system was used for the roof and structural columns of the building.

The interior is separated into two areas by a large CMU block wall. On one side of the space are the receiving department and the warehouse for storage of empty product containers; on the other side are the manufacturing processes for the fuel additives and the shipping department. The building includes various safety and environmental control features including 14 wall-mounted exhaust fans for the removal of chemical fumes, advanced ESFR fire control and fire suppression equipment designed to handle the additives and a split system cooling - HVAC system. Construction of the warehouse included extensive MEP design to support Power Service's proprietary manufacturing processes and equipment.

Construction included a 24' wide fire lane around the facility and 1,150 feet of sandstone gravity retaining wall along the east side.

 

 

Printable Version - Construction Project Profile (PDF Format):

Power Service - Weatherford, Texas

 


 

More Projects:

View more manufacturing facility construction projects by General Contractor Bob Moore Construction.

 

Are you interested in project management expertise with a focus on controlling your construction costs and meeting your schedule for a commercial building project? Please contact Kyle Whitesell or Larry Knox at (817) 640-1200. Or if you prefer, contact us online with our contact form.

More Project Photos