Bob Moore
Search
Schedule

National Oilwel Varco Hydra-Rig

Hydra Rig selected design / build contractor Bob Moore Construction and Alliance Architects to add 113,800 SF of manufacturing space in two buildings on their current Fort Worth campus. The project presented several challenges, including the demolition of several older buildings. Existing power lines ran beneath the new building site, between two existing buildings. Before old building was demolished, power lines had to be rerouted around the site and transfers had to be relocated without interrupting power in either existing buildings.